Project Background
Phase I of Chengdu Rail Transit Line 8 adopts A-type 6-car marshalling vehicles, and the car body is made of lightweight aluminum alloy, which is the lightest A-type vehicle of Chengdu Metro at present. The train has a total length of 140m, a width of 3m, and a maximum operating speed of 80km/h. The fixed passenger capacity is 1804 people, with a maximum capacity of 2564 people, which is 20% higher than the B-type car and can greatly meet the travel needs of citizens along the subway line. According to the plan, the total number of vehicles allocated for Line 8 Phase I will reach 43.
Phase I of Chengdu Rail Transit Line 8 starts from Lianhua Station in the south and ends at Shilidian station in the north. The total length of the line is 29.1km, with 25 stations, crossing densely populated areas, which can to some extent meet people's different travel needs and alleviate urban traffic pressure.
Application Products
During the construction of the first phase of Chengdu Metro Line 8, Shengwei brand LC-FC network cable single mode dual core transceiver pigtails and SC-FC network cable single mode single core transceiver pigtails were used, and 26000 meters of Shengwei LC-LC single mode dual core telecom grade fiber optic jumpers were provided.